10–11 Jun 2024
Batiment Principal
Europe/Paris timezone

Electron Beam Instrumentation for SLS2.0

11 Jun 2024, 09:25
25m
Principal/1-32 - Salle A2.1.32/Libra (Batiment Principal)

Principal/1-32 - Salle A2.1.32/Libra

Batiment Principal

Synchrotron SOLEIL L'Orme des Merisiers Départementale 128 91190 Saint-Aubin FRANCE
14
Show room on map
Oral presentation Session 5

Speaker

Cigdem Ozkan Loch (Paul Scherrer Institut)

Description

As of September 30th, 2023, the upgrade to the SLS storage ring has commenced. Some of the SLS diagnostics will be integrated with modifications to satisfy the requirements of SLS 2.0, including changes to their quantity, specifications, and technical implementations. Additionally, new diagnostics systems will be installed that have been tested at the SLS. After providing an update on the progress of the SLS 2.0 project, a technical overview of the diagnostic systems and the current progress will be presented.
Beam position monitors and feedback systems will not be the focus of this presentation.

Primary author

Cigdem Ozkan Loch (Paul Scherrer Institut)

Presentation materials